Client:
HIDROPROJECTO – Consultores de Hidráulica e Salubridade, SA.
Owner:
EPAL – Empresa Pública de Águas de Lisboa
Location:
Torres Vedras
Construction Area:
3.400 m²
Project:
1987/1988
Conclusion:
1989
Program:
Project for the Torres Vedras Pumping Station, including the building and cistern
Team:
Architecture
– António Pedro Batista Pardal Monteiro – Architect
– João Cottinelli Telmo Pardal Monteiro – Architect
– Manuel Cottinelli Telmo Pardal Monteiro – Architect
– Rodrigo Moutinho
– Amadeu Lourenço
Specialities
HIDROPROJECTO – Consultores de Hidráulica e Salubridade, SA.